Services
Case Studies
Industry
About us
Contact us
EN
Case Studies
Smart Energy Solutions for Luxury Hotel
Project Overview
Location:
Jeddah, Saudi Arabia
Highlights:
- Pactive conducted a detailed energy audit and proposed retrofit project for a luxury hospitality facility featuring 232 rooms and expansive event spaces. The project aimed to optimize energy performance while maintaining the brand’s high standards of comfort and operational excellence.
Key Results
Estimated impact in numbers
Our Innovative Solution
Pactive recommended upgradation of legacy systems with demand-driven, energy-efficient technologies. EC (Electronically Commutated) fans replacement with conventional AHU units, while ventilation controls were proposed with intelligent automation.
Pre-Retrofit
The hotel's AHU and ventilation systems relied on manual or inefficient operation, leading to significant energy waste. Gas-fired boilers and Conventional Electric Calorifiers were used for hot water generation.
Proposed Retrofit
High-efficiency fans and demand-controlled ventilation were recommended to optimize air delivery. Heat Pump based Water heating System was proposed for Energy Efficiency, cost savings and major reductions in CO₂ emissions.