cmp_PublicImageAsset

Services

Case Studies

Industry

About us

Contact us

EN

Case Studies

Smart Energy Solutions for Luxury Hotel

Back to case study listing

Project Overview

Location:

Jeddah, Saudi Arabia

Highlights:

  • Pactive conducted a detailed energy audit and proposed retrofit project for a luxury hospitality facility featuring 232 rooms and expansive event spaces. The project aimed to optimize energy performance while maintaining the brand’s high standards of comfort and operational excellence.

Key Results

Estimated impact in numbers

< 3.5 Years

Estimated payback period

SAR 19 M+

Investment Required

> 1067 T

Predicted CO₂ savings annually

Our Innovative Solution

Pactive recommended upgradation of legacy systems with demand-driven, energy-efficient technologies. EC (Electronically Commutated) fans replacement with conventional AHU units, while ventilation controls were proposed with intelligent automation.

Pre-Retrofit

The hotel's AHU and ventilation systems relied on manual or inefficient operation, leading to significant energy waste. Gas-fired boilers and Conventional Electric Calorifiers were used for hot water generation.

Proposed Retrofit

High-efficiency fans and demand-controlled ventilation were recommended to optimize air delivery. Heat Pump based Water heating System was proposed for Energy Efficiency, cost savings and major reductions in CO₂ emissions.

Client Success in Action — Real Results. Lasting Impact.

Pactive logo

Explore Pactive

Esco services
Whistleblower Policy

Follow us on

linkedn