Services
Case Studies
Industry
About us
Contact us
EN
Case Studies
Energy Management for Hospitality in Makkah
Project Overview
Location:
Makkah, Saudi Arabia
Highlights:
- Pactive implemented an energy efficiency upgrade at the hotel, a 234-room hospitality facility designed to blend modern comfort with traditional Saudi heritage. The project focused on HVAC, hot water systems, and lighting to reduce energy use while ensuring guest satisfaction.
Key Results
Our impact in numbers
Our Innovative Solution
Pactive deployed a centralized Chiller Plant Manager (CPM) module to oversee HVAC operations. Smart lighting upgrades and hot water system enhancements further improved performance. These measures were integrated into an upgraded BMS to ensure long-term energy optimization.
Pre-Retrofit
The facility used gas-fired boilers and legacy chillers with limited automation. Lighting and HVAC systems were manually operated and inefficient.
Post-Retrofit
The chiller system was optimized with advanced CPM control, while smart lighting and BMS upgrades delivered significant improvements in energy savings and operational responsiveness.
Case studies